Preparations in Progress for Testing at ALIN Pilot Plant

Preparations are underway to conduct waste processing tests using ALIN BOX technology in Kuki, Saitama prefecture.

Test goals:

  1. To break down waste into simple organic molecules with sub-critical water hydrolysis as well as disinfect and deodorize the residue
  2. To produce electricity from biogas emitted from fermented residue

The aim of this project is to verify the effectiveness of ALIN technology with hard data and to establish protocols for dealing with potential issues that may arise during deployment.

Tests are scheduled to begin in May, 2025.
We will post updates as the plant goes into operation.